
COMMERCIAL FLOORS
Commercial epoxy flooring in Central Ohio.
RECENT WORK
Recent commercial projects.
BEFORE & AFTER
Office corridors and rooms
Bare concrete turned into a dark flake floor through hallways and offices.
Get my free quote
BeforeAfterBEFORE & AFTER
Open flex space
Cracked slab repaired, then coated in light gray flake.
Get my free quote
BeforeAfter
BeforeAfterWhy businesses choose a coated floor.
Easy to clean.
Spills, salt and tracked-in dirt wipe off sealed concrete.
Brighter space.
A light flake floor reflects overhead light in shops and flex spaces.
Professional look.
Customers and staff notice the floor first.
Less downtime.
Most spaces are finished in a few days, not weeks.
| Spec | Detail |
|---|---|
| Systems | Flake epoxy or metallic epoxy |
| Topcoat | Polyaspartic on most jobs. Polyurea when the manufacturer recommends it, which is usually commercial |
| Example timeline | 1,200 sq ft in 2–2.5 days |
| Warranty | 5 years |
| Service area | All of Central Ohio |
Got questions?
Commercial epoxy FAQs
How long does a commercial epoxy floor take?
It depends on size and slab condition. Our crew finished a 1,200-square-foot commercial floor in two to two and a half days.
Can you work around our business hours?
We plan the schedule with you before the job starts so the space is down for as little time as possible.
What about cracked or damaged concrete?
We repair cracks before coating. Our flex-space project started with a badly cracked slab.
When do you use polyurea instead of polyaspartic?
When the coating manufacturer recommends it for the space, which is usually commercial.
How is a commercial job priced?
By square footage, slab condition and system. Every commercial quote is done on-site.
See what your floor could look like.
Get a price range in a few minutes with the online estimator, or call 614-496-6489.
